Quotulatiousness

May 22, 2013

Spain needs to put new submarine design on a diet

Filed under: Europe, Military — Tags: , , , — Nicholas @ 16:33

If they launch the new class of submarines as designed, they might not be able to re-surface after diving:

Spanish engineers, who already spent some $680 million on designing the new generation S-80 class submarine, say it is a major “technical innovation.” There is just one problem the calculations show – if submerged into water, it may never come up again.

The Spanish media has been furiously discussing the errors made by the state-owned Navantia construction company, which has spent about a third of the huge $2.2 billion budget only to produce an ‘overweight’ submarine that is not able to float.

Spain’s Ministry of Defense has confirmed that Navantia detected “deviations” in the new submarine’s design, thus delaying its March 2015 scheduled launch for one or two years.

Navantia said an excess weight of up to 100 tons has been added to the sub during construction, and the company may have to redesign the whole craft.

No Comments

No comments yet.

RSS feed for comments on this post.

Sorry, the comment form is closed at this time.

Powered by WordPress