The Tank Museum
Published on 22 Dec 2017Development of Matilda I began in 1935. Production began just before the outbreak of the Second World War in July 1939 and 139 vehicles were delivered by August 1940. 97 of these were lost after the evacuation of troops from Dunkirk, without having had much use. The rest were removed from British service in 1941, but captured vehicles stayed in German service in domestic security roles.
Support the work of The Tank Museum on Patreon: ► https://www.patreon.com/tankmuseum
Or donate http://tankmuseum.org/support-us/donateVisit The Tank Museum SHOP: ►https://tankmuseumshop.org/
Twitter: ► https://twitter.com/TankMuseum
Tiger Tank Blog: ► http://blog.tiger-tank.com/
Tank 100 First World War Centenary Blog: ► http://tank100.com/ #tankmuseum #tanks
March 3, 2019
Tank Chats #43 Matilda I | The Tank Museum
Comments Off on Tank Chats #43 Matilda I | The Tank Museum
No Comments
No comments yet.
RSS feed for comments on this post.
Sorry, the comment form is closed at this time.