Quotulatiousness

February 6, 2012

Brazil fights back against celebrity oppression

Filed under: Americas, Economics, Media — Tags: , , , — Nicholas @ 11:25

John Conroy on the recent backlash in Brazil against foreign celebrities using domestic issues as platforms for moralizing:

Film director James Cameron, responsible for Terminator, Titanic and, more recently, Avatar, has been working on a considerable side-project for a few years now. Cameron film fans shouldn’t get their hopes up, however. This side-project is more political than filmic. He has been trying to prevent the Brazilian government from constructing Belo Monte, the world’s third-largest hydroelectric dam, on the Xingu river which runs through the Amazonian rainforest.

[. . .]

But then something very curious happened. Another tribe of Brazilians, normally so fearful of being seen outside of their natural habitat, fought back. Geeky university students and their professors made a film with zero production values undermining every argument used by Cameron, the NGOs, the Kayapo and TV Globo. These are the myths they challenged:

  • The Indians will have nowhere to live. Actually, a student from Brasilia University who has done little else but study the impact of the project on indigenous lands responded that not one of the indigenous lands in the region will be flooded. There are 12 indigenous territories near the project in an area of 56,000 square kilometres with 2,200 indigenous people living on them. That’s two-and-a-half times the size of Wales. Thirty consultative meetings were held in tribal villages and recorded on video.
  • The dam and its reservoirs will flood and destroy 640 square kilometres of rainforest. Not exactly. The reservoirs will cover an area of 502.8 square kilometres of which 228 square kilometres are already within the body of the river itself.
  • The dam will starve the Xingu National Park of water. This is not true. The students displayed a map revealing that the park is in fact 1,300 kilometres up river of the dam.
  • For eight months of the year the region above the dam is nearly a desert making the dam inefficient and only capable of generating a third of its installed capacity. The implication here is that there is insufficient water to drive the turbines at full power. However, during the high-water period of the year, the river empties 28 million litres of water per second at the point of the turbines, creating an extraordinary potential energy generation of 11,233 megawatts (MW). Even at the river’s lowest levels in the month of October, it delivers 800,000 litres per second. The annual average energy production of Belo Monte will be 4,571MW, or 41 per cent of the potential generating capacity, not one third. This will power 40 per cent of Brazil’s entire residential energy consumption.

No Comments

No comments yet.

RSS feed for comments on this post.

Sorry, the comment form is closed at this time.

Powered by WordPress